Civil Engineering MCQ Questions and Answers

Civil Engineering

Civil Engineering MCQ Questions and Answers for Engineering students. Civil Engineering Multiple Choice Questions for competitive examinations.

1-Admixtures which cause early setting, and hardening of concrete are called as

(A) Retarders

(B) Accelerators

(C) Super plasticizers

(D) Workability admixture

 

2-The ratio of linear stress to linear strain is called

(A) Poisson’s ratio

(B) Rigidity modulus

(C) Bulk modulus

(D) Modulus of elasticity

 

3-The flood discharge passing through a river at a weir site is usually estimated by using

(A) a dilution technique

(B) a gauge – discharge curve

(C) a surface float

(D) a current meter

 

4-Brick containing large proportion of soluble salts liable to become patches of white deposit are called as

(A) Laminates

(B) Under burning

(C) Efflorescence

(D) Bloating

 

5-Every cross section of a shaft, which is subjected to a twisting moment, is under

(A) Bending stress

(B) Shear stress

(C) Tensile stress

(D) Compressive stress

 

6-Command area which includes both cultivable and uncultivable area is known as

(A) Extensive command area

(B) Net command area

(C) Gross command area

(D) Cultivable command area

 

7-The sound which contains even after source is cut off is called

(A) Interference

(B) Style

(C) Reverberation

(D) Echo

 

8-Which of the following theories is most suitable for ductile material?

(A) Distortion energy theory

(B) Maximum shear stress theory

(C) Maximum principal strain theory

(D) Maximum principal stress theory

 

9-Velocity of flow at a particular point is reduced to zero, which is known as

(A) Stagnation point

(B) Center point

(C) End point

(D) Starting point

 

10-A contour interval is

(A) Area of contour map

(B) Vertical distance between two successive contour lines

(C) Scale of contour map

(D) Horizontal equivalent

 

11-The locus of the point of application of the resultant force at any given section of a pre-stressed concrete beam is the

(A) P line

(B) C line

(C) pressure line or thrust line

(D) elastic line

 

12-The order of the flexibility matrix for structure is

(A) equal to the number of redundant force plus three

(B) less than the number of redundant force

(C) more than the number of redundant force

(D) equal to the number of redundant force

 

13-The function of reinforcements in pre-stressed concrete is to

(A) produce initial compressive stress in concrete in the tension zone

(B) provide sufficient torsion resistance

(C) resist tensile stresses

(D) provide sufficient bond

 

14-The maximum tension in a cable occurs

(A) at all point in the cable

(B) at the centre of the cable

(C) at the lowest point in the cable

(D) at the highest point in the cable

 

15-Stiffeners are used in a plate girder

(A) to take the bearing stress

(B) to reduce the shear stress

(C) to reduce the compressive stress

(D) to avoid buckling of web plate

 

ANSWERS:

1-(B), 2-(D), 3-(B), 4-(C), 5-(B), 6-(C), 7-(C), 8-(B), 9-(A), 10-(B), 11-(C), 12-(D), 13-(A), 14-(D), 15-(D)