Civil Engineering Multiple Choice Questions (MCQ)

Civil Engineering

Civil Engineering Multiple Choice Questions (MCQ)

1-Sesasoning of timer is done to

(A) remove sap from the timber

(B) straighten the timber

(C) harden the timber

(D) soften the timber

 

2-High alumina cement is produced by fusing together of mixture of

(A) Limestone and chalk

(B) Limestone and clay

(C) Limestone and gypsum

(D) Limestone and bauxite

 

3-Extreme end supports of a bridge superstructure

(A) Abutment

(B) Pier

(C) Revetment

(D) Apron

 

4-The formation of dull patches occurs on the finished polished surface. It is called

(A) Wrinkling

(B) Flashing

(C) Blisting

(D) Bloom

 

5-The consistency of concrete can be measured in terms of

(A) Crushing

(B) Slump

(C) Impact

(D) Hardness

 

6-A layer of concrete, .masonry stones etc. culvert or a bridge to prevent scouring laid like flooring at the entrance or outlet of a

(A) Apron

(B) Wing walls

(C) Revetment

(D) Foundation

 

7-Due to shrinkage, wood sometimes flattens during drying, this is known as

(A) Split

(B) Collapse

(C) Cup

(D) Check

 

8-The degree of workability of concrete can be found in terms of

(A) Fineness of coarse aggregate

(B) Impact factor

(C) Hardness

(D) Compacting factor

 

9-The center to center distance between any two adjacent support is called

(A) The span

(B) Clear span

(C) Clear total span

(D) Total span

 

10-In paint, linseed oil is used as

(A) A water proofing base

(B) A vehicle

(C) A drier

(D) A thinner

 

ANSWERS:

1-(A), 2-(D), 3-(A), 4-(D), 5-(B), 6-(A), 7-(B), 8-(D), 9-(D), 10-(B)